Text_Template
  Module 4: Pavement Design
Lecture 29 Rigid pavement design
  

Example

A cement concrete pavement of thickness 18 cm, has two lanes of 7.2 m with a joint. Design the tie bars.  
 
(Solution:) 
Given h=18 cm, b=7.2/2=3.6m, $S_s=1700~kg/cm^2$ $W=2400~kg/cm^2$ $f=1.5$ $S_b=24.6~kg/cm^2$.  
 
Step 1: diameter and spacing: Get $A_s$ from

\begin{eqnarray*}
A_s=\frac{3.6\times{}18\times{}2400\times{}1.5}{100\times{}1750}=1.33~cm^2/m
\end{eqnarray*}

Assume $\phi=1~cm,~\Rightarrow~A=0.785~cm^2$. Therefore spacing is $\frac{100\times{}0.785}{1.33}=59~cm$, say $55~cm$  
 
Step 2: Length of the bar: Get $L_t$ from

\begin{eqnarray*}
L_t=\frac{1\times{}1750}{2~246}~=~36.0~cm
\end{eqnarray*}

[Ans] Use $1~cm~\phi$ tie bars of length of $36~cmi~@~55~cm~c/c$