|
Design the pavement for construction of a new bypass with the following data:
- Two lane carriage way
- Initial traffic in the year of completion of construction = 400 CVPD (sum
of both directions)
- Traffic growth rate = 7.5 %
- Design life = 15 years
- Vehicle damage factor based on axle load survey = 2.5 standard axle per
commercial vehicle
- Design CBR of subgrade soil = 4%.
|
|