Module 4: Project Completion
Review and Future Directions

NETWORK BASED PROJECT MANAGEMENT - II

Weaknesses
  • The network logic does not permit the possibility of looping or going back to a certain point and repeating the actions. This may be a practical possibility eg rework after an inspection or going back to the drawing board after a design review. Stochastic networks, of which GERT (Graphical Evaluation and Review Technique) is one example, attempt to achieve such features.
16 17 18 19 20
Page 21-26
Prof.S.G.Deshmukh & Prof.Arun Kanda