Generating Limits
It is not always necessary that all the units of a plant are available to share a load. Some of the units may be taken off due to scheduled maintenance. Also it is not necessary that the less efficient units are switched off during off peak hours. There is a certain amount of shut down and start up costs associated with shutting down a unit during the off peak hours and servicing it back on-line during the peak hours. To complicate the problem further, it may take about eight hours or more to restore the boiler of a unit and synchronizing the unit with the bus. To meet the sudden change in the power demand, it may therefore be necessary to keep more units than it necessary to meet the load demand during that time. This safety margin in generation is called spinning reserve . The optimal load dispatch problem must then incorporate this startup and shut down cost for without endangering the system security.
The power generation limit of each unit is then given by the inequality constraints
 |
(5.10) |
The maximum limit Pmax is the upper limit of power generation capacity of each unit. On the other hand, the lower limit Pmin pertains to the thermal consideration of operating a boiler in a thermal or nuclear generating station. An operational unit must produce a minimum amount of power such that the boiler thermal components are stabilized at the minimum design operating temperature.
Example 5.2
Example 5.3
|