Volume of calibrating cylinder (cm3), V1 =
Mass of sand for filling the calibrating cylinder and cone (g), W1 =
Mass of sand for filling only the cone (g), W2 =
Mass of sand in the calibrating cylinder (g), W3 = W1 - W2
Bulk density of sand (g/cm3),
Field Test No. |
1 |
|
|
|
Mass of pouring cylinder + sand before pouring in hole (g), W4
|
|
|
|
|
Mass of pouring cylinder + sand after pouring in hole (g), W5
|
|
|
|
|
Mass of sand used in the hole (g), W6 = W4 - W5 - W2
|
|
|
|
|
Volume of excavated hole (cm3),
|
|
|
|
|
Mass of excavated soil (g), W7
|
|
|
|
|
Average water content, w (%)
|
|
|
|
|
Field bulk density (g/cm3),
|
|
|
|
|
Field dry density (g/cm3),
|
|
|
|
|
In-situ dry density = Average of the computed values
|