Tunnels are generally of a few metres to several kilometers. Its diameter ranges from that of less than a metre to 16-17metres. It may be near to the ground or may be at large depths below the ground surface, such as those tunnels in mountains. Before starting the tunneling work (process of making a tunnel), following investigations should be carried out meticulously -
- Hydrological survey
- Geological survey and exploration
- Rock temperature and gases
- Factor influencing the depth of the tunnel below the ground level
- Factor affecting the diameter of the tunnel
- Geological features along the axis of the tunnel
The above factors are important for arriving at the design of the tunnel, but a site engineer has to investigate the parameters before design. Also, a construction engineer should always verify the available data for design. If there is any discrepancy in the existing profile with the coordination during design of a tunnel, modifications are needed.
|