Required:
a) The weight of magnetite coating produced, flux required and slag made.
b) The weight of blister copper, and the % of copper recovery
c) The blowing time of each stage.
d) The volume and % composition of the converter gases.
13) A cupola melts per hour 15 tons of pig iron of composition of scrap containing. C 3.5%, Si 2.2% Mn 0.8% and PO.7%, and 5 ton of scarp containing C 3,%, Si1.8% Mn 1.1% and P O.2%.
The dry air used is measured at 313K to melt 1ton of pig iron and scrap per minute.
During melting 20% of total Si charged, 15% of total Mn charged 1% of total Fe charged and 5% of C is oxidized,19% of carbon of coke is absorbed by iron during milting. Enough is charged to give 30% CaO in slag. The coke is 92% C and 8% SiO2 and weight of coke is 1/9 of the total weight of pig iron and scrap.
Required:
a) Charge balances of cupola for 5 hr run.
b) The % composition of resulting cast iron, slag and gases.
14) A plant treats 210 tonnes of material in a shift of metal grade 40% and tailing has metal grade 0.2% . Calculate mass of concentrate and tailing.
15) A roasted lead ore is smelted in a blast furnace with enough to make a slag of 18.5% CaO .The coke is 16% of the roasted ore and analyzes 90% C and . The composition of roasted ore;. Of the lead charged 5% is lost in dust andflue, and 8% enters the matte. Of the copper charged 50 % enters the matte and rest copper enters into lead bullion .Ten % of S enters into gases.
Find: Per 1000Kg roasted ore
The amounts of lead bullion, matte and
|