Arithmetic Check for Reduction of Level

In case of Rise and Fall method for Reduction of level, following arithmetic checks are applied to verify calculations.

S B.S. - S F.S. = S Rise - S Fall = Last R.L. - First R.L.

With reference to Table 13.3:

S B.S. - S F.S. = 4.795 - 7.145 = - 2.350

S Rise - S Fall. = 1.130 - 3.480 = - 2.350

Last R.L. - First R.L.= 97.650 - 100.000 = -2.350

Table 13.3 Field book for Reduction of level

 

Staff Reading (m)

Difference in elevation (m)

H.I (m)

R.L. (m)

Remarks

Points

B.S.

I.S.

F.S.

Rise
Fall
A
2.365
 
 
 
 
102.365
100.000
B.M.
S 1
0.685
 
1.235
1.130
 
101.815
101.130
T.P.1
S2
1.745 
 
3.570
 
2.885
99.990
98.245
T.P.2
B
 
 
2.340
 
0.595
102.365
97.650
 
S
 4.795
 
7.145
 
3.480
101.815
 
 