Leveling

For leveling, the degree of accuracy is usually expressed as ,

where L = Horizontal length of the route

For example, if there is an error of closure of 0.24 m in a route having perimeter of 10,000 m,

Thus, the degree of accuracy in the levelling operation = 0.0024 , where L is the horizontal distance of any sight in meters.

<< Back | Next >>