Fig. 5.42 Pile Groups |
|
Usually the GL and the base of the piled foundation are made flush with one another. As a result the Pile foundation has a higher load bearing capacity and lesser settlement. This is because the pile in piled raft foundation are in contact with more soil than the free standing pile group. |
|
|
|
|
|