Sl.No | Chapter Name | English |
---|---|---|
1 | Lecture 01 : Introduction to Network Analysis | Download Verified |
2 | Lecture 02 : Introduction to network and some terminology | Download Verified |
3 | Lecture 03 : Construction of network | Download Verified |
4 | Lecture 04 : Introduction to activity on node diagram and comparison with arrow diagram | Download Verified |
5 | Lecture 05 : Rules of dummy job,redundancy & cycles | Download Verified |
6 | Lecture 06 : Critical path and its calculation | Download Verified |
7 | Lecture 07 : Algorithm for critical path early start and early finish times | Download Verified |
8 | Lecture 08 : Late start and late finish times algorithm | Download Verified |
9 | Lecture 09 : Understanding the slack | Download Verified |
10 | Lecture 10 : Examples of slacks and calculation of AON network | Download Verified |
11 | Lecture 11 : Project due dates and earliest completion time examples | Download Verified |
12 | Lecture 12 : CPM model and cost modelling | Download Verified |
13 | Lecture 13 : Lowest cost schedule and optimum schedule | Download Verified |
14 | Lecture 14 : Crashing and stretching of jobs | Download Verified |
15 | Lecture 15 : Crashing and stretching of jobs (Contd.) | Download Verified |
16 | Lecture 16 : Introduction to PERT | Download Verified |
17 | Lecture 17 : Expected length of critical path calculation with examples | Download Verified |
18 | Lecture 18 : Probability of completion of a project | Download Verified |
19 | Lecture 19 : Event oriented project management | Download Verified |
20 | Lecture 20 : Algorithm and computer program | Download Verified |
Sl.No | Language | Book link |
---|---|---|
1 | English | Download |
2 | Bengali | Not Available |
3 | Gujarati | Not Available |
4 | Hindi | Not Available |
5 | Kannada | Not Available |
6 | Malayalam | Not Available |
7 | Marathi | Not Available |
8 | Tamil | Not Available |
9 | Telugu | Not Available |