Sl.No Chapter Name English
1Lecture 01 : Introduction to Network AnalysisDownload
Verified
2Lecture 02 : Introduction to network and some terminologyDownload
Verified
3Lecture 03 : Construction of networkDownload
Verified
4Lecture 04 : Introduction to activity on node diagram and comparison with arrow diagramDownload
Verified
5Lecture 05 : Rules of dummy job,redundancy & cyclesDownload
Verified
6Lecture 06 : Critical path and its calculationDownload
Verified
7Lecture 07 : Algorithm for critical path early start and early finish timesDownload
Verified
8Lecture 08 : Late start and late finish times algorithmDownload
Verified
9Lecture 09 : Understanding the slackDownload
Verified
10Lecture 10 : Examples of slacks and calculation of AON networkDownload
Verified
11Lecture 11 : Project due dates and earliest completion time examplesDownload
Verified
12Lecture 12 : CPM model and cost modellingDownload
Verified
13Lecture 13 : Lowest cost schedule and optimum scheduleDownload
Verified
14Lecture 14 : Crashing and stretching of jobsDownload
Verified
15Lecture 15 : Crashing and stretching of jobs (Contd.)Download
Verified
16Lecture 16 : Introduction to PERTDownload
Verified
17Lecture 17 : Expected length of critical path calculation with examplesDownload
Verified
18Lecture 18 : Probability of completion of a projectDownload
Verified
19Lecture 19 : Event oriented project managementDownload
Verified
20Lecture 20 : Algorithm and computer programDownload
Verified


Sl.No Language Book link
1EnglishDownload
2BengaliNot Available
3GujaratiNot Available
4HindiNot Available
5KannadaNot Available
6MalayalamNot Available
7MarathiNot Available
8TamilNot Available
9TeluguNot Available