Name | Download | Download Size |
---|---|---|
Lecture Note | Download as zip file | 26M |
Module Name | Download | Description | Download Size |
---|---|---|---|
Week 1. Introduction, Course Context, Construction Project Management | Lesson 6 | Project Scheduling Levels (_ Scheduling Engineer Responsibilities) | 287 |
Week 1. Introduction, Course Context, Construction Project Management | Lesson 5 | Project Stakeholders, Project Phases, Project Organization | 590 |
Week 1. Introduction, Course Context, Construction Project Management | Lesson 4 | Construction Industry and National Growth | 1289 |
Week 1. Introduction, Course Context, Construction Project Management | Lesson 3 | Course Scope _ Plan, Questions and Discussions | 362 |
Week 1. Introduction, Course Context, Construction Project Management | Lesson 2 | Objectives of a Project, Scientific Way of Managing of Objectives | 608 |
Week 1. Introduction, Course Context, Construction Project Management | Lesson 1 | What is Project Management, Is Project Management an Art or Science | 350 |
Week 2. Time Management, Work Breakdown Structure (WBS), Gantt Charts | Lesson 6 | Bar Charts for Resource Usage, Pros and Cons | 525 |
Week 2. Time Management, Work Breakdown Structure (WBS), Gantt Charts | Lesson 5 | Develop a Bar Chart (Exercise) | 235 |
Week 2. Time Management, Work Breakdown Structure (WBS), Gantt Charts | Lesson 3 | Tools for Time Management | 922 |
Week 2. Time Management, Work Breakdown Structure (WBS), Gantt Charts | Lesson 4 | Gantt Bar Chart - History, Representation, Progress Monitoring, Uses, Steps to draw a Bar Chart | 749 |
Week 2. Time Management, Work Breakdown Structure (WBS), Gantt Charts | Lesson 1 | Time Management - Overview | 489 |
Week 2. Time Management, Work Breakdown Structure (WBS), Gantt Charts | Lesson 2 | Basics of Work Breakdown Structure (WBS) | 549 |
Week 3. Duration Estimation, Network Representation & Analysis -1 | Lesson 6 | Representing Results in a Bar Chart, AON Example -2 | 549 |
Week 3. Duration Estimation, Network Representation & Analysis -1 | Lesson 5 | Networks - Introduction, Techniques | 756 |
Week 3. Duration Estimation, Network Representation & Analysis -1 | Lesson 4 | Summary of Key Topics, Types of Networks | 690 |
Week 3. Duration Estimation, Network Representation & Analysis -1 | Lesson 3 | Piling Activity Example, Applicability of different methods to Estimate Activity Duration | 618 |
Week 3. Duration Estimation, Network Representation & Analysis -1 | Lesson 2 | Factors influencing Productivity, Example for Ideal Productivity, Factored Productivity and Working Time Factor | 984 |
Week 3. Duration Estimation, Network Representation & Analysis -1 | Lesson 1 | Duration Estimation - Types, Inputs, Methods, Parametric Estimation | 556 |
Sl.No | Chapter Name | MP4 Download |
---|---|---|
1 | Lesson 1. What is Project Management?, Is Project Management an Art/ Science? | Download |
2 | Lesson 2. Objectives of a Project, Scientific Way of Managing of Objectives | Download |
3 | Lesson 3. Course Scope & Plan, Questions and Discussions | Download |
4 | Lesson 4. Construction Industry and National Growth | Download |
5 | Lesson 5. Project Stakeholders, Project Phases, Project Organization | Download |
6 | Lesson 6. Project Scheduling Levels (& Scheduling Engineer Responsibilities) | Download |
7 | Lesson 1. Time Management - Overview | Download |
8 | Lesson 2. Basics of Work Breakdown Structure (WBS) | Download |
9 | Lesson 3. Tools for Time Management | Download |
10 | Lesson 4. Gantt / Bar Chart - History, Representation, Progress Monitoring, Uses, Steps to draw a Bar Chart | Download |
11 | Lesson 5. Develop a Bar Chart (Exercise) | Download |
12 | Lesson 6. Bar Charts for Resource Usage, Pros and Cons | Download |
13 | Lesson 1. Duration Estimation - Types, Inputs, Methods, Parametric Estimation | Download |
14 | Lesson 2. Factors influencing Productivity, Example for Ideal Productivity, Factored Productivity and Working Time Factor | Download |
15 | Lesson 3. Piling Activity Example, Applicability of different methods to Estimate Activity Duration | Download |
16 | Lesson 4. Summary of Key Topics, Types of Networks | Download |
17 | Lesson 5. Networks - Introduction, Techniques | Download |
18 | Lesson 6. Representing Results in a Bar Chart, AON Example -2 | Download |
19 | Lesson 1. Introduction to Floats, Types of Floats and Example- 1 Discussion | Download |
20 | Lesson 2. Example 4, Usage of Floats for Project Decisions | Download |
21 | Lesson 3. Two-Span Bridge: Activity Identification and Duration Estimation (Cont.,) | Download |
22 | Lesson 4. Two-Span Bridge: Activity Identification and Duration Estimation | Download |
23 | Lesson 5. Two-Span Bridge: Activity- Duration- Predecessors | Download |
24 | Lesson 6. Review Network Analysis Concepts, Apply Network Analysis to Two-Span Bridge (Cont.,) | Download |
25 | Lesson 7. Two-Span Bridge: Network Analysis | Download |
26 | Lesson 8. Two-Span Bridge: Resource Constraints in Network Logic | Download |
27 | Lesson 1. Fast-Tracking vs Crashing, Relationship between Activity Direct Cost & Activity Duration - Assumptions | Download |
28 | Lesson 2. Time-Cost trade-off: ABCD Example Project, Steps for Crashing | Download |
29 | Lesson 3. Time-Cost trade-off: Class Exercise- 2 | Download |
30 | Lesson 4. Time-Cost trade-off: Problem- 3, Tabulation Approach | Download |
31 | Lesson 5. Incorporating Factors such as Bonus and Penalty; Problem- 4 | Download |
32 | Lesson 1. What is Resource?, Influence of Resources on Schedule, Two-Span Bridge Example, Resource Decisions; ABCD Example Project; Resource Over-Allocation; Example-2 | Download |
33 | Lesson 2. Projects & Resources, Example of Two Resources, Exercise, Two-Span Bridge Example | Download |
34 | Lesson 3. Review Problem -1; Problem -2 (Cash Resource); Resolving Over-Allocation | Download |
35 | Lesson 4. Problem 1- Two Resources; Resolving Resource Allocation Problems | Download |
36 | Lesson 5. Resource Profile Requirements | Download |
37 | Lesson 6. Resource Leveling - Example Network | Download |
38 | Lesson 7. Minimum Moment Concept | Download |
39 | Lesson 8. Applying Improvement Factor - Illustration | Download |
40 | Lesson 1. Introduction to Precedence Diagramming Method (PDM) | Download |
41 | Lesson 2. PDM network representation and its issues, Network Calculation | Download |
42 | Lesson 3. PDM Problem #1 | Download |
43 | Lesson 4. Issues in PDM, Negative Lags, Problem #2 Solution | Download |
44 | Lesson 5. PDM Analysis with non-continuous duration, Floats | Download |
45 | Lesson 6. Defining Relationship (Based on Construction Method) - Simple Shed | Download |
46 | Lesson 7. Project Monitoring & Control Typical Project Time Monitoring Process, Levels and Frequency of updates | Download |
47 | Lesson 8. Project Control Process, Daily Progress Report, Macro Level Update- Data Need, Standard Progress Reports | Download |
48 | Lesson 9. Application: Two Span Bridge ES Schedule | Download |
49 | Lesson 1. Review of Key Issues in Project Monitoring, Earned Value Concept Through Examples | Download |
50 | Lesson 2. Basic Earned Value Definitions & Terminology, Summary | Download |
51 | Lesson 3. Uncertainty in Project Schedules | Download |
52 | Lesson 4. PERT Background & Assumptions, Stepwise Procedure | Download |
53 | Lesson 5. PERT Example Problem, Summary | Download |
54 | Lesson 6. Course Conclusion | Download |
55 | Lesson 7. Emerging Trends/Tools in Project Planning | Download |
56 | Lesson 8. Industry Perspective Prof. N. Raghavan | Download |
57 | Lesson 9. Final Exam Pattern, Acknowledgements | Download |
Sl.No | Chapter Name | English |
---|---|---|
1 | Lesson 1. What is Project Management?, Is Project Management an Art/ Science? | Download Verified |
2 | Lesson 2. Objectives of a Project, Scientific Way of Managing of Objectives | Download Verified |
3 | Lesson 3. Course Scope & Plan, Questions and Discussions | Download Verified |
4 | Lesson 4. Construction Industry and National Growth | Download Verified |
5 | Lesson 5. Project Stakeholders, Project Phases, Project Organization | Download Verified |
6 | Lesson 6. Project Scheduling Levels (& Scheduling Engineer Responsibilities) | Download Verified |
7 | Lesson 1. Time Management - Overview | Download Verified |
8 | Lesson 2. Basics of Work Breakdown Structure (WBS) | Download Verified |
9 | Lesson 3. Tools for Time Management | Download Verified |
10 | Lesson 4. Gantt / Bar Chart - History, Representation, Progress Monitoring, Uses, Steps to draw a Bar Chart | Download Verified |
11 | Lesson 5. Develop a Bar Chart (Exercise) | Download Verified |
12 | Lesson 6. Bar Charts for Resource Usage, Pros and Cons | Download Verified |
13 | Lesson 1. Duration Estimation - Types, Inputs, Methods, Parametric Estimation | Download Verified |
14 | Lesson 2. Factors influencing Productivity, Example for Ideal Productivity, Factored Productivity and Working Time Factor | Download Verified |
15 | Lesson 3. Piling Activity Example, Applicability of different methods to Estimate Activity Duration | Download Verified |
16 | Lesson 4. Summary of Key Topics, Types of Networks | Download Verified |
17 | Lesson 5. Networks - Introduction, Techniques | Download Verified |
18 | Lesson 6. Representing Results in a Bar Chart, AON Example -2 | Download Verified |
19 | Lesson 1. Introduction to Floats, Types of Floats and Example- 1 Discussion | Download Verified |
20 | Lesson 2. Example 4, Usage of Floats for Project Decisions | Download Verified |
21 | Lesson 3. Two-Span Bridge: Activity Identification and Duration Estimation (Cont.,) | Download Verified |
22 | Lesson 4. Two-Span Bridge: Activity Identification and Duration Estimation | Download Verified |
23 | Lesson 5. Two-Span Bridge: Activity- Duration- Predecessors | Download Verified |
24 | Lesson 6. Review Network Analysis Concepts, Apply Network Analysis to Two-Span Bridge (Cont.,) | Download Verified |
25 | Lesson 7. Two-Span Bridge: Network Analysis | Download Verified |
26 | Lesson 8. Two-Span Bridge: Resource Constraints in Network Logic | Download Verified |
27 | Lesson 1. Fast-Tracking vs Crashing, Relationship between Activity Direct Cost & Activity Duration - Assumptions | Download Verified |
28 | Lesson 2. Time-Cost trade-off: ABCD Example Project, Steps for Crashing | Download Verified |
29 | Lesson 3. Time-Cost trade-off: Class Exercise- 2 | Download Verified |
30 | Lesson 4. Time-Cost trade-off: Problem- 3, Tabulation Approach | Download Verified |
31 | Lesson 5. Incorporating Factors such as Bonus and Penalty; Problem- 4 | Download Verified |
32 | Lesson 1. What is Resource?, Influence of Resources on Schedule, Two-Span Bridge Example, Resource Decisions; ABCD Example Project; Resource Over-Allocation; Example-2 | Download Verified |
33 | Lesson 2. Projects & Resources, Example of Two Resources, Exercise, Two-Span Bridge Example | Download Verified |
34 | Lesson 3. Review Problem -1; Problem -2 (Cash Resource); Resolving Over-Allocation | Download Verified |
35 | Lesson 4. Problem 1- Two Resources; Resolving Resource Allocation Problems | Download Verified |
36 | Lesson 5. Resource Profile Requirements | Download Verified |
37 | Lesson 6. Resource Leveling - Example Network | Download Verified |
38 | Lesson 7. Minimum Moment Concept | Download Verified |
39 | Lesson 8. Applying Improvement Factor - Illustration | Download Verified |
40 | Lesson 1. Introduction to Precedence Diagramming Method (PDM) | Download Verified |
41 | Lesson 2. PDM network representation and its issues, Network Calculation | Download Verified |
42 | Lesson 3. PDM Problem #1 | Download Verified |
43 | Lesson 4. Issues in PDM, Negative Lags, Problem #2 Solution | Download Verified |
44 | Lesson 5. PDM Analysis with non-continuous duration, Floats | Download Verified |
45 | Lesson 6. Defining Relationship (Based on Construction Method) - Simple Shed | Download Verified |
46 | Lesson 7. Project Monitoring & Control Typical Project Time Monitoring Process, Levels and Frequency of updates | Download Verified |
47 | Lesson 8. Project Control Process, Daily Progress Report, Macro Level Update- Data Need, Standard Progress Reports | Download Verified |
48 | Lesson 9. Application: Two Span Bridge ES Schedule | Download Verified |
49 | Lesson 1. Review of Key Issues in Project Monitoring, Earned Value Concept Through Examples | Download Verified |
50 | Lesson 2. Basic Earned Value Definitions & Terminology, Summary | Download Verified |
51 | Lesson 3. Uncertainty in Project Schedules | Download Verified |
52 | Lesson 4. PERT Background & Assumptions, Stepwise Procedure | Download Verified |
53 | Lesson 5. PERT Example Problem, Summary | Download Verified |
54 | Lesson 6. Course Conclusion | Download Verified |
55 | Lesson 7. Emerging Trends/Tools in Project Planning | Download Verified |
56 | Lesson 8. Industry Perspective Prof. N. Raghavan | Download Verified |
57 | Lesson 9. Final Exam Pattern, Acknowledgements | Download Verified |
Sl.No | Chapter Name | Bengali |
---|---|---|
1 | Lesson 1. What is Project Management?, Is Project Management an Art/ Science? | Download |
2 | Lesson 2. Objectives of a Project, Scientific Way of Managing of Objectives | Download |
3 | Lesson 3. Course Scope & Plan, Questions and Discussions | Download |
4 | Lesson 4. Construction Industry and National Growth | Download |
5 | Lesson 5. Project Stakeholders, Project Phases, Project Organization | Download |
6 | Lesson 6. Project Scheduling Levels (& Scheduling Engineer Responsibilities) | Download |
7 | Lesson 1. Time Management - Overview | Download |
8 | Lesson 2. Basics of Work Breakdown Structure (WBS) | Download |
9 | Lesson 3. Tools for Time Management | Download |
10 | Lesson 4. Gantt / Bar Chart - History, Representation, Progress Monitoring, Uses, Steps to draw a Bar Chart | Download |
11 | Lesson 5. Develop a Bar Chart (Exercise) | Download |
12 | Lesson 6. Bar Charts for Resource Usage, Pros and Cons | Download |
13 | Lesson 1. Duration Estimation - Types, Inputs, Methods, Parametric Estimation | Download |
14 | Lesson 2. Factors influencing Productivity, Example for Ideal Productivity, Factored Productivity and Working Time Factor | Download |
15 | Lesson 3. Piling Activity Example, Applicability of different methods to Estimate Activity Duration | Download |
16 | Lesson 4. Summary of Key Topics, Types of Networks | Download |
17 | Lesson 5. Networks - Introduction, Techniques | Download |
18 | Lesson 6. Representing Results in a Bar Chart, AON Example -2 | Download |
19 | Lesson 1. Introduction to Floats, Types of Floats and Example- 1 Discussion | Download |
20 | Lesson 2. Example 4, Usage of Floats for Project Decisions | Download |
21 | Lesson 3. Two-Span Bridge: Activity Identification and Duration Estimation (Cont.,) | Download |
22 | Lesson 4. Two-Span Bridge: Activity Identification and Duration Estimation | Download |
23 | Lesson 5. Two-Span Bridge: Activity- Duration- Predecessors | Download |
24 | Lesson 6. Review Network Analysis Concepts, Apply Network Analysis to Two-Span Bridge (Cont.,) | Download |
25 | Lesson 7. Two-Span Bridge: Network Analysis | Download |
26 | Lesson 8. Two-Span Bridge: Resource Constraints in Network Logic | Download |
27 | Lesson 1. Fast-Tracking vs Crashing, Relationship between Activity Direct Cost & Activity Duration - Assumptions | Download |
28 | Lesson 2. Time-Cost trade-off: ABCD Example Project, Steps for Crashing | Download |
29 | Lesson 3. Time-Cost trade-off: Class Exercise- 2 | Download |
30 | Lesson 4. Time-Cost trade-off: Problem- 3, Tabulation Approach | Download |
31 | Lesson 5. Incorporating Factors such as Bonus and Penalty; Problem- 4 | Download |
32 | Lesson 1. What is Resource?, Influence of Resources on Schedule, Two-Span Bridge Example, Resource Decisions; ABCD Example Project; Resource Over-Allocation; Example-2 | Download |
33 | Lesson 2. Projects & Resources, Example of Two Resources, Exercise, Two-Span Bridge Example | Download |
34 | Lesson 3. Review Problem -1; Problem -2 (Cash Resource); Resolving Over-Allocation | Download |
35 | Lesson 4. Problem 1- Two Resources; Resolving Resource Allocation Problems | Download |
36 | Lesson 5. Resource Profile Requirements | Download |
37 | Lesson 6. Resource Leveling - Example Network | Download |
38 | Lesson 7. Minimum Moment Concept | Download |
39 | Lesson 8. Applying Improvement Factor - Illustration | Download |
40 | Lesson 1. Introduction to Precedence Diagramming Method (PDM) | Download |
41 | Lesson 2. PDM network representation and its issues, Network Calculation | Download |
42 | Lesson 3. PDM Problem #1 | Download |
43 | Lesson 4. Issues in PDM, Negative Lags, Problem #2 Solution | Download |
44 | Lesson 5. PDM Analysis with non-continuous duration, Floats | Download |
45 | Lesson 6. Defining Relationship (Based on Construction Method) - Simple Shed | Download |
46 | Lesson 7. Project Monitoring & Control Typical Project Time Monitoring Process, Levels and Frequency of updates | Download |
47 | Lesson 8. Project Control Process, Daily Progress Report, Macro Level Update- Data Need, Standard Progress Reports | Download |
48 | Lesson 9. Application: Two Span Bridge ES Schedule | Download |
49 | Lesson 1. Review of Key Issues in Project Monitoring, Earned Value Concept Through Examples | Download |
50 | Lesson 2. Basic Earned Value Definitions & Terminology, Summary | Download |
51 | Lesson 3. Uncertainty in Project Schedules | Download |
52 | Lesson 4. PERT Background & Assumptions, Stepwise Procedure | Download |
53 | Lesson 5. PERT Example Problem, Summary | Download |
54 | Lesson 6. Course Conclusion | Download |
55 | Lesson 7. Emerging Trends/Tools in Project Planning | Download |
56 | Lesson 8. Industry Perspective Prof. N. Raghavan | Download |
57 | Lesson 9. Final Exam Pattern, Acknowledgements | Download |
Sl.No | Chapter Name | Hindi |
---|---|---|
1 | Lesson 1. What is Project Management?, Is Project Management an Art/ Science? | Download |
2 | Lesson 2. Objectives of a Project, Scientific Way of Managing of Objectives | Download |
3 | Lesson 3. Course Scope & Plan, Questions and Discussions | Download |
4 | Lesson 4. Construction Industry and National Growth | Download |
5 | Lesson 5. Project Stakeholders, Project Phases, Project Organization | Download |
6 | Lesson 6. Project Scheduling Levels (& Scheduling Engineer Responsibilities) | Download |
7 | Lesson 1. Time Management - Overview | Download |
8 | Lesson 2. Basics of Work Breakdown Structure (WBS) | Download |
9 | Lesson 3. Tools for Time Management | Download |
10 | Lesson 4. Gantt / Bar Chart - History, Representation, Progress Monitoring, Uses, Steps to draw a Bar Chart | Download |
11 | Lesson 5. Develop a Bar Chart (Exercise) | Download |
12 | Lesson 6. Bar Charts for Resource Usage, Pros and Cons | Download |
13 | Lesson 1. Duration Estimation - Types, Inputs, Methods, Parametric Estimation | Download |
14 | Lesson 2. Factors influencing Productivity, Example for Ideal Productivity, Factored Productivity and Working Time Factor | Download |
15 | Lesson 3. Piling Activity Example, Applicability of different methods to Estimate Activity Duration | Download |
16 | Lesson 4. Summary of Key Topics, Types of Networks | Download |
17 | Lesson 5. Networks - Introduction, Techniques | Download |
18 | Lesson 6. Representing Results in a Bar Chart, AON Example -2 | Download |
19 | Lesson 1. Introduction to Floats, Types of Floats and Example- 1 Discussion | Download |
20 | Lesson 2. Example 4, Usage of Floats for Project Decisions | Download |
21 | Lesson 3. Two-Span Bridge: Activity Identification and Duration Estimation (Cont.,) | Download |
22 | Lesson 4. Two-Span Bridge: Activity Identification and Duration Estimation | Download |
23 | Lesson 5. Two-Span Bridge: Activity- Duration- Predecessors | Download |
24 | Lesson 6. Review Network Analysis Concepts, Apply Network Analysis to Two-Span Bridge (Cont.,) | Download |
25 | Lesson 7. Two-Span Bridge: Network Analysis | Download |
26 | Lesson 8. Two-Span Bridge: Resource Constraints in Network Logic | Download |
27 | Lesson 1. Fast-Tracking vs Crashing, Relationship between Activity Direct Cost & Activity Duration - Assumptions | Download |
28 | Lesson 2. Time-Cost trade-off: ABCD Example Project, Steps for Crashing | Download |
29 | Lesson 3. Time-Cost trade-off: Class Exercise- 2 | Download |
30 | Lesson 4. Time-Cost trade-off: Problem- 3, Tabulation Approach | Download |
31 | Lesson 5. Incorporating Factors such as Bonus and Penalty; Problem- 4 | Download |
32 | Lesson 1. What is Resource?, Influence of Resources on Schedule, Two-Span Bridge Example, Resource Decisions; ABCD Example Project; Resource Over-Allocation; Example-2 | Download |
33 | Lesson 2. Projects & Resources, Example of Two Resources, Exercise, Two-Span Bridge Example | Download |
34 | Lesson 3. Review Problem -1; Problem -2 (Cash Resource); Resolving Over-Allocation | Download |
35 | Lesson 4. Problem 1- Two Resources; Resolving Resource Allocation Problems | Download |
36 | Lesson 5. Resource Profile Requirements | Download |
37 | Lesson 6. Resource Leveling - Example Network | Download |
38 | Lesson 7. Minimum Moment Concept | Download |
39 | Lesson 8. Applying Improvement Factor - Illustration | Download |
40 | Lesson 1. Introduction to Precedence Diagramming Method (PDM) | Download |
41 | Lesson 2. PDM network representation and its issues, Network Calculation | Download |
42 | Lesson 3. PDM Problem #1 | Download |
43 | Lesson 4. Issues in PDM, Negative Lags, Problem #2 Solution | Download |
44 | Lesson 5. PDM Analysis with non-continuous duration, Floats | Download |
45 | Lesson 6. Defining Relationship (Based on Construction Method) - Simple Shed | Download |
46 | Lesson 7. Project Monitoring & Control Typical Project Time Monitoring Process, Levels and Frequency of updates | Download |
47 | Lesson 8. Project Control Process, Daily Progress Report, Macro Level Update- Data Need, Standard Progress Reports | Download |
48 | Lesson 9. Application: Two Span Bridge ES Schedule | Download |
49 | Lesson 1. Review of Key Issues in Project Monitoring, Earned Value Concept Through Examples | Download |
50 | Lesson 2. Basic Earned Value Definitions & Terminology, Summary | Download |
51 | Lesson 3. Uncertainty in Project Schedules | Download |
52 | Lesson 4. PERT Background & Assumptions, Stepwise Procedure | Download |
53 | Lesson 5. PERT Example Problem, Summary | Download |
54 | Lesson 6. Course Conclusion | Download |
55 | Lesson 7. Emerging Trends/Tools in Project Planning | Download |
56 | Lesson 8. Industry Perspective Prof. N. Raghavan | Download |
57 | Lesson 9. Final Exam Pattern, Acknowledgements | Download |